The #3 crane is the north most crane right now, even still, it will be moved right up along Wilshire, and be what we call a cruiser. Gonna climb up the northern exterior of the building. Yes... extremely tight fit in that core. As for steel erection. Id give it another month before the guys from Schuff Steel start hanging iron. Waiting on the formwork of the core to rise high enough so that our iron doesn't swing in taking out the whole thing, also waiting on imbeds (steel erection clips) to be welded that go in the concrete. Once its a go, id imagine two floors every ten days... faster if we didnt have to wait for the concrete guys to build their core. The columns that are in the hole now do not tie into the core, another column sits on top of those (ie. column splice) and those will have erection clips for iron to tie into the imbeds in the concrete core.

Last edited by unioniron433; Aug 4, 2014 at 8:10 PM.