Quote:
Originally Posted by Mr Downtown View Post
I haven't yet seen anything at an engineering level of detail, but the most detailed site plans I've seen, in the PD, just show new diamonds at a different location. However, Related told me a few months ago that discussions with CN were ongoing, based on CN's subsequent announcement of single-tracking and realigning the SCAL. Because property—or at least easement—swaps are involved, it may be complicated by railroad lawyers.

Thanks. A grade separation would be tremendously beneficial, it would address the last major chokepoint on the Rock Island (now that Englewood is done), and this bottleneck will become much more prominent if Metra manages to shift the SWS to LaSalle as per long-term dreams following the 75th street projects to be funded by the new capital bill. Unless, would rebuilding the Grand Crossing connection allow CN to significantly reduce traffic on the SCAL?
Reply With Quote