Posted Jun 18, 2016, 12:56 PM
|
Registered User
|
|
Join Date: Jul 2005
Posts: 1,336
|
|
Update on the current expansion of the Metrolink tram system though the city centre.
Quote:
Originally Posted by jrb
|
Quote:
Originally Posted by VDB
Metrolink: Second City Crossing | St Peter's Square to Victoria
Tram line | City Zone
Thread: http://www.skyscrapercity.com/showth...6944&page=2041
- Address: John Dalton St, Cross St and Exchange Square, City Zone Manchester M2
- Contractor: MPact-Thales
- Number of expanded stations: 3
- Number of new stations: 1
- Interchanges with National Rail: 1, at Victoria
- Interchanges with existing Network: 2, at Victoria and St Peter's Square
- Operator: Metrolink, Transport for Greater Manchester
Current status: Under Construction
Nearest transport: N/A
Amazing pictures by Freel07 showing St Peter's Square tram station coming together. Platform and new shelters are being craned in:
The platforms come in prefabricated slabs which are craned into place:
These pictures by Mikemcniven show the new shelters at St Peter's Square tramstop:
|
|