Posted Nov 14, 2021, 4:25 PM
|
|
Registered User
|
|
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,392
|
|
Downtown Street Reconstruction and Beautification for 2021
Quote:
Originally Posted by bob rulz
200 South is getting a huge reconstruction from 400 West to 900 East. The main improvements are a bike lane, improved bus stops, more pedestrian crossings, curb bulb-outs, and more landscaping.
It's not a fully protected bike lane, but it does bring the bike lane behind the bus stops, which I think is very cool.
|
.
|