Posted Feb 12, 2019, 8:13 PM
|
|
Road Engineer Wannabe
|
|
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,236
|
|
Is this simply politican posturing, or does ONPC intend to actually finish twinning 69 (except with either further delays or cheapening out, such as at-grade intersections through the FN's)?
Sonysnob posted the latest news (as of Feb 11) in the Ontario Highways thread.
|