View Single Post
  #726  
Old Posted Sep 2, 2020, 6:55 PM
atbw atbw is offline
Closed account
 
Join Date: Apr 2018
Posts: 401
Quote:
Originally Posted by Nouvellecosse View Post
In terms of the Bedford hwy, I'd have to see the actual data but I'd suspect most people biking on that stretch would be making shorter, more local trips rather than biking from Bedford to central hfx as the BH acts as the main street for a fairly large area. It would definitely be necessary to see the actual data before any higher level investments could be justified beyond something like a bit of line paint. Such investments are limited and should be spent where they have the greatest potential for benefit.
Part of it is that there is painted lines right now, on both sides, and no sidewalks for many parts of the road. Accessing bus stops, businesses, or cycling for commute or for fun are all reserved for the brave. The suggested plan is a multi-use path, similar to the one along Barrington St. to accommodate pedestrians and cyclists more safely and remove them from the flow of traffic.

The problem with current bike infrastructure is its still piecemeal. The Barrington Greenway dumps you out at the South End onto a 4-lane road. At the North End, there's a light you have to wait 5 minutes for if you want to continue up Devonshire. Similar on Lower Water, the Queen's Marque lane dumps you into an intersection that narrows to a 1-maybe-2 lane road, and then into the Cogswell Interchange.

There's stretches that do work well, but the bits in between are still largely reserved for the brave.
Reply With Quote