Quote:
Originally Posted by LMich
I was thinking the same thing. The complex may very well be under construction, but it's not clear the actual tower is anywhere near a sure thing. If it had, it would have been a national (and maybe even international) event.
|
well, Balneário Camboriu has some 250+ (even 300m) towers approved and some u/c and it was not a national (and even less international) event.
but at least at SSC we DO have info about such things. If nobody at SSC Brasil (including over 100 Belo Horizonte forumers) heard it was approved, it wasn´t