View Single Post
  #55  
Old Posted Sep 6, 2021, 1:47 AM
Twitter1 Twitter1 is offline
Registered User
 
Join Date: Aug 2015
Posts: 583
A 7.85-million gallon cistern is being built at the end of the site. Really impressive the amount of rain collection and flood control they've done.







Collaborative Building.



Reply With Quote