View Single Post
  #85  
Old Posted Apr 14, 2021, 1:13 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 24,068
Final design of the new Joint Library and Archives and Ottawa Central Library building on LeBreton Flats. Design has been value engineered a bit, mostly the roof and top floor. Otherwise, more green features have been added and Covid proof enhancements (better ventilation, touchless doors and such).








https://www.cbc.ca/news/canada/ottaw...otos-1.5985865
Reply With Quote