View Single Post
  #44  
Old Posted May 15, 2015, 7:26 PM
Gresto's Avatar
Gresto Gresto is online now
Registered User
 
Join Date: Jul 2009
Location: Toronto
Posts: 3,774
Quote:
Originally Posted by Automation Gallery View Post
The bad, The diagrid structural system is now gone from the building
The good, The heritage facade of Hue's Kitchen is now being retained in the redesign, and the bldg. now has a new height of: 329.5 meters/1081 feet
The height increase is great, but the loss of the diagrid is very unfortunate.
Reply With Quote