View Single Post
  #34  
Old Posted May 3, 2013, 12:10 AM
thomax's Avatar
thomax thomax is offline
Registered User
 
Join Date: May 2012
Location: Toronto
Posts: 5,380
The site is fenced off and construction is starting on the new parkette and clock tower.

Quote:
Originally Posted by MeIsThomas View Post
A new parkette will be built in downtown Stoney Creek on the western corner of Jones St and King St E. The parkette has been planned since the 1990s and was part of the Stoney Creek Old Towne Urban Design Plan approved by the former city council before amalgamation (Olde Towne Urban Design Plan pdf). The parkette design will mimic the design of the arbour structure at the fountain area on the opposite corner of Jones&King E. The parkette will feature a new clock tower, open green space, a circular walkway with benches, and a mixture of trees and shrubs. The project is expected to cost $400 000 and construction is expected to begin in spring 2013.



How the site currently looks:


Fountain area in the foreground that the parkette design will mimic, with the future parkette location in the background to the left:


Image Source: Google Maps&Google Street View
Reply With Quote