Quote:
Originally Posted by Acajack
We haven't even decided if it will be one of two corridors (Allumettières to the north, or Taché-Aylmer-Principale to the south) or if we'll use both corridors.
But it will be one of those three options I am pretty sure.
The direct linkages with the O-Train system (if any) have not been determined yet either.
|
Will a two transfer plan via Bayview be palatable to Gatineau residents?
Or will they not notice it until it is too late?