View Single Post
  #96  
Old Posted Dec 11, 2010, 2:24 AM
Dmajackson's Avatar
Dmajackson Dmajackson is offline
Moderator
 
Join Date: Feb 2008
Location: B3K Halifax, NS
Posts: 9,355
No photo since the site isn't lighted right now but the foundation wall has been poured on the west (parking lot) side. The building is going to have a massive set back on College Street for the drop off area. The foundation is continuing right to the back door to the church so the hallway connecting the buildings will be interior and not just a simple exterior path.
Reply With Quote