View Single Post
  #3  
Old Posted Jul 21, 2019, 11:47 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 24,024
That is fascinating stuff. Can't wait to see other cities. Must have taken months to complete.

Just one small omission for the Education development: you din't include La Cité Collégiale projects. The main campus at 801 Aviation has added 2 or 3 buildings in that time period; the new "Excentricité" attached to "H" and "G" opened in September 2018, the extension to building "A" along the Aviation entrance was opened in 2011 if I remember correctly and building "I" was open sometime in the mid-2000s (might be just out of your time frame). La Cité Collégiale's trades campus opened at 8700 Jeanne d'Acrc (near Trim, just north of the 174) in 2010.

https://www.collegelacite.ca/campus.htm

You explained why you did not add transit lines. I was wondering if the same applied to hospital expansions?
Reply With Quote