by looking at the temp path entrance i can assume the steel frame now exposed is all for expansion mentioned in the above article? -

- Well it now seems as though the P.A. didn't think things through, the conclusion i've drawn, because i know it was asked about in the freedom tower thread is that when the P.A. constructed the temp path entrance they didnt consider the ground furthest east (where the 60 ft high supports are footed) was in the zone needed to be excavated for T2 or they would just leave it to silverstein, but it looks to be like further excavation is now taking place under the former tamp path entrance overhang, correct me if i'm wrong..