Quote:
Originally Posted by Dengler Avenue
I’m aware of that, but for the segment through T-V-G, if BC’s averse to using the Public-Private-Partnership (P3) model, a tunnel might be the only option.
The slopes on the south side of the highway are hard to stabilize, from what I read.
|
So are you willing to pay a $10 toll every time you go from Revelstoke to Sicamous? I'm sure a tunneling solution isn't very feasible without something like that. The toll would probably be needed if a tunnel was done, P3 or not.