View Single Post
  #96  
Old Posted Oct 7, 2005, 9:13 PM
Ecker's Avatar
Ecker Ecker is offline
. . . . . . .
 
Join Date: Nov 2004
Location: Minneapolis
Posts: 210
I went by the City of Lakes/Fusion site today and took some pictures.

The building on the far left will be demolished, although from the boards the architect showed at the meeting last night, it looks like the stonework entrance will be retained.


The square additons on either side of the Abbot building will be demolished and the Abbot's hipped roof will be rebuilt. The north and south sides will be all glass.




The buildings in the following pictures will all be demolished and replaced with the low-rise portion of the project.



I plan to post all the information I've posted here about this project on the TCScape forum. I registered, but haven't gotten a confirmation email yet. Anyone know if I have to wait for an adminstrator there to send me the email? If it's automatically generated I think I may have messed up my email address.
Reply With Quote