View Single Post
  #10568  
Old Posted Jan 13, 2021, 9:24 PM
Pedestrian's Avatar
Pedestrian Pedestrian is offline
Registered User
 
Join Date: Dec 2016
Location: San Francisco
Posts: 24,177
Quote:
Originally Posted by pseudolus View Post
Let's hope it doesn't sit idle as long as the Chicago Spire site? How long was the 535 Mission St site idle?
The 535 Mission site really was a hole in the ground filled with gravel. Oceanside is much farther along. A better comparison might be 706 Mission where a lot of underground work was done in anticipation of the ultimate completion of the Legoretta design of the Mexican Museum. When 4-Seasons came along with their tower proposal many years later--a totally different type of building--much of this work turned out to be worthless but I don't think that'll happen with Oceanwide. In SF it seems like about half the time to put up a tower is spent on foundation work and below ground work. That would mean these buildings are half-way done. Somebody will pick up the ball but the great unknown is what kind of recovery from the COVID economic catastrophe we'll have: A quick bounce-back or a slow grinding recession. And will the work-from-home boomlet fade as people realize the folks actually coming into the office for face time with the boss are the ones getting promoted (and paid more)? If so, and the value of downtown office space bounces back, Oceanside might not be on hold as long as some think.
Reply With Quote