^^^^^Based on my experiences, plans are never done quicker than expected. A 2 - 4 week time frame for submission of plans can most often be revised to 2 - 4 months.
|
With the City council wanting this to be built as much as a lot of us do, I think they will push this through, however architects want to be sure the drawings are good before they issue them for construction and bids.