Quote:
Originally Posted by RyeJay
With a submission in November, how long do you think an answer will require? It would be nice to have the Queen Street lot developed in time for the new library. The grand opening would be more grand.
|
Wasn't the HbD process that if it met all the rules; you'd get an approval (development permit) within 90 days? If my memory is right, the permit process shouldn't be more than 3 months, including review by the design review committee.