View Single Post
  #3789  
Old Posted Oct 23, 2018, 3:38 AM
Orlando's Avatar
Orlando Orlando is offline
Registered User
 
Join Date: Nov 2007
Location: Seattle, WA
Posts: 3,991
If they are at 100% Design Development, they probably have 6 months more for Construction Documents. Though, they could be permitting the foundation and core work prior to finishing the rest of the documents, which I assume is very likely. Given the client, and the progress they are making, I think we will be seeing excavation starting sometime in the spring or summer of next year.

I really like what they did at the top by adding that curvature, and the extra height. Just think if they would have lopped off another bay and just added that extra floor space on top, we could have had a tower close to 450 feet tall. We need something taller in the city to show SLC is not just a small town.

Last edited by Orlando; Nov 8, 2018 at 5:16 AM.
Reply With Quote