^^^ Yeah, with 150 N Riverside 60% leased, the other developers with projects in the pipeline are licking their chops and trying to get to the front of line for the next wave of leasing to hit the market. O'Donnell is probably kicking himself for not setting up the foundations to take even more floors than he has been rumored to add. He would be able to possibly lock out another tower from the market for another year or two if he had more space available. The leasing numbers for 150 N Riverside are extremely impressive so far, looks like adventurous design is winning out over middle of the road design in this cycle. Oh well, better to completely sell out a project early than aim too high and crash and burn.