Quote:
Originally Posted by Daprato Rigali
great, thanks for the quick response.
soon = 1 week, or 1 month?
also, is this typical of other high-rise construction prep?
first time we've heard it in the south loop that i can recall
|
Not an engineer, so someone correct me if wrong....Believe that instead of drilled/poured concrete caissons they are using driven H-piles for the foundation work due to certain soil conditions. The repetitive banging is the pile driver, though I am unsure of a completion eta. Once the building starts going vertical it should stop.