View Single Post
  #35  
Old Posted Apr 15, 2006, 12:47 AM
spyguy's Avatar
spyguy spyguy is offline
THAT Guy
 
Join Date: Oct 2005
Posts: 5,949
http://www.transitchicago.com/news/c...ticleid=101316

Public Comment Next Step in Federal New Start Process

Chicago Transit Authority will hold public meetings next month to receive input on the proposed Circle Line project. The meetings are part of the Alternatives Analysis study—the first step in pursuing federal funding for major transit projects. The Alternatives Analysis study is designed to examine all the transit options available and determine a locally preferred alternative.

Meeting dates and venues are:

Tuesday, May 2, 2006
6:00 p.m. – 8:00 p.m.

Mexican Fine Arts Center Museum
West Wing Auditorium
1852 W. 19th Street
Chicago, IL 60608

Wednesday, May 3, 2006
6:00 p.m. – 8:00 p.m.

Lincoln Park High School
Room 103
2001 N. Orchard Street
Chicago, IL 60614

Thursday, May 4, 2006
6:00 p.m. – 8:00 p.m.

University of Illinois at Chicago (UIC)
Molecular Biology Research Building
Room 1017
900 S. Ashland Avenue
Chicago, IL 60607

All venues are accessible to people with disabilities.

The proposed Circle Line would link all of CTA’s rail lines and all of Metra’s lines in a study area bounded by 39th Street on the south, Fullerton Parkway on the north, Western Avenue on the west and Lake Michigan on the east, creating improved transit connections throughout the six-county region and helping to further ease traffic congestion and improve travel times.

DMJM+Harris, A Joint Venture, which specializes in transit/rail, highway and bridge, marine, aviation and energy infrastructures is conducting the Alternatives Analysis study. The Federal Transit Administration’s New Starts program requires transit project proposals to proceed through a process of planning, design and construction. The FTA process consists of five formal steps: Alternatives Analysis, Environmental Impact Statement, Preliminary Engineering, Final Design and Construction.
Reply With Quote