View Single Post
  #31  
Old Posted Mar 16, 2021, 5:00 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283
Quote:
Originally Posted by nazrey View Post
KTM ETS - Intercity train connection with Klang Valley integrated transit system
Operated by KTM (Keretapi Tanah Melayu) | National Railway of Malaysia
Speed: 140-160 km/hr
Total Length: 755 km (as of 2021)
Extension Project: 192 km (2023)
Code:
STATION                      CONNECTION LINE
Tanjung Malim                Line 2
Batang Kali                  Line 2
Rawang                       Line 2
Sungai Buloh                 Line 2, 12
Kepong Sentral               Line 2, 12
Kuala Lumpur                 Line 1, 2 
KL Sentral                   Line 1, 2, 5, 6, 7, 8, 9, 10, Seremban Express
Bandar Tasik Selatan         Line 1, 4, 7
Kajang                       Line 1, 9
Seremban                     Line 1
Pulau Sebang                 Line 1

https://upload.wikimedia.org/wikiped...cropped%29.jpg

Last edited by nazrey; Mar 17, 2021 at 9:48 AM.
Reply With Quote