10/14/2021 - Channel 7 news on Tuesday says that "crews installed a 36-inch steel cylinder 100 feet into the ground on Fremont Street.
Engineers believe the steel cylinder will reduce erosion and vibrations from construction and vehicles."
Desperation! The building has sunk one inch since the work began to stop the sinking. One engineer says that he predicted that the work would cause more problems.
__________________
(Essex) Fox Plaza 52nd year resident in 2023 - (the building everyone loves to hate :------>))
|