View Single Post
  #23  
Old Posted Apr 25, 2012, 1:19 AM
kph06's Avatar
kph06 kph06 is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,025
Its been a while since this one has had a photo posted, so I snagged one tonight. They are working on the top floor steel, and the concrete on the south side is almost topped out. For some reason the last column line or two was started after the building was topped out, maybe due to site restrictions or specific requirements of this building as I'm sure its way more complicated than the average residential build.

Reply With Quote