Its been a while since this one has had a photo posted, so I snagged one tonight. They are working on the top floor steel, and the concrete on the south side is almost topped out. For some reason the last column line or two was started after the building was topped out, maybe due to site restrictions or specific requirements of this building as I'm sure its way more complicated than the average residential build.