My question is inspired by the formwork going on at 3065 Robie. I see columns going right on top of footings before an actual slab has been put down. What makes that the right choice for this project?
Ziobrop pretty well covered this but anyways this photoset from 2814 Isleville shows it as well.

The columns have been poured and the gravel is levelled to the top of the bases yet there is a significant gap between that grade and the door into the lobby. Once the drainage pipes and floor are poured the two will be flush with each other.