Posted May 12, 2017, 4:09 PM
|
|
Modulator
|
|
Join Date: Nov 2013
Location: Phoenix, AZ
Posts: 4,404
|
|
Looks like there were 2 tower crane obstruction evaluations submitted. Latitude coordinates are slightly different, so can these be 2 separate tower cranes at 400ft?
*Edit. Just browsed through the new FAA Evaluations and there are 4 separate tower crane evaluations all at 400ft. Safe to say, we won't see 4 cranes at 400 ft., so going to assume there will actually be only 1 tower crane until otherwise...
Overview
Study (ASN): 2017-AWP-3958-OE
Prior Study:
Status: Work In Progress
Received Date: 04/24/2017
Entered Date: 04/24/2017
Map: View Map
Construction Info Structure Summary
Notice Of: CONSTR
Duration: TEMP (Months: 18 Days: 0)
Work Schedule: 07/17/2017 to 01/01/2019
Structure Type: Crane
Structure Name: Tower Crane Block 23
FCC Number:
Structure Details Height and Elevation
Latitude (NAD 83): 33° 26' 49.23" N
Longitude (NAD 83): 112° 04' 16.90" W
Datum: NAD 83
City: Phoenix
State: AZ
Nearest County: Maricopa
Proposed
Site Elevation:
1087
Structure Height:
400
Total Height (AMSL):
1487
|