View Single Post
  #18  
Old Posted Feb 27, 2009, 11:40 PM
ed21x ed21x is offline
Registered User
 
Join Date: Jan 2006
Posts: 136
Quote:
Originally Posted by wannabeplanner View Post
I was reading this months Airliner Magazine and there was a little blurb and a photo about Taoyuan Airport. This photo looks like they are doing some major digging in the parking lot outside of T2. The Caption says they are working on the foundation of Terminal 3 expected to be completed around 2020.. That doesn't sound right to me... Can somebody confirm? I am thinking maybe they are working on the airport MRT line?
I highly doubt that considering the current infrastructure of T1/T2 are nowhere close to max capacity. The TTY Access MRT is suppose to have a stop in both Terminal 1 and 2.
Reply With Quote