View Single Post
  #1439  
Old Posted Jul 26, 2021, 2:19 PM
CJSA CJSA is offline
Registered User
 
Join Date: Feb 2008
Posts: 15
https://ibb.co/tqYHCtm

New NSCC construction on the Sydney waterfront.
This is building B that is under construction. Building A is the area fronted on Charlotte st. with the concrete barriers in front. Building A will connected to building B via a pedway. Building C and D will be constructed to the south of building B.

Last edited by CJSA; Jul 26, 2021 at 4:39 PM.
Reply With Quote