View Single Post
  #552  
Old Posted Apr 20, 2023, 3:56 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by OCCheetos View Post
$535M is the revised estimate.

To extend the line just to Fallowfield would cost $2.7B (which includes the grade separations).
So since the $535M will be spent either way, the extension to Fallowfield actually costs an extra $2.2B, or is that $535M per grade separation (there are 3 if you include Woodruff, which shouldn’t be part of the OTrain budget, but I could see the city including it anyway)?
__________________
Pronouns: He/Him/His
Reply With Quote