Posted Dec 20, 2022, 2:17 PM
|
|
Registered User
|
|
Join Date: Sep 2022
Posts: 166
|
|
I recall a site mgr at Cobalt telling me each buildings pad was about 80 truckloads of cement. This one, due to its footprint is likely 100 loads or more. They might be trying to get this in and set before the big storm later in the week and thru the holiday shutdown.
|