Posted Sep 11, 2022, 12:57 PM
|
|
Registered User
|
|
Join Date: Jun 2016
Location: London
Posts: 9,131
|
|
Forming now up for the 13th floor slab in the south tower. Have now poured the NE corner L2 floor slab and have nearly finished pouring the L2 walls and posts along the entire east side of pit. Forming is now going in for the L2 floor slab and ramp from the L3 to L2 level along the west side of pit.
|