Posted Aug 16, 2022, 11:05 PM
|
 |
Moderator
|
|
Join Date: May 2006
Location: Right here, right now
Posts: 12,786
|
|
Bump. The finish out permits through floor 73 have been filed over the last two days. Now we just need the other two cranes and some vertical construction.
|