Thanks and loving all the updates.

What you see being installed are piers not piles. Similar but different.

The large excavation you see for the elevator core will be a huge pier cap that ties all the piers together and on top of the pier cap the elevator core walls will rise to the top of the building

Keep up the updates! Myself and a lot of other lurkers on this site really appreciate it




Quote:
Originally Posted by 360_Ray View Post
The pile drillers have migrated to the northern edge of the building outline on both the San Antonio and Guadalupe street edges. I'm hoping that means they are done with piles in the center and southern sections, but who knows.

They hauled off about half of the hazmat spoil from the Crane 2 excavation, but no other work in that hole. Does someone know the dates for Crane 2 install?

Large backhoe continues to slowly expand the central core pit for the elevator mechanical space I assume.

They cleared out the NE corner of the lot and half of a 40' double wide mobile office just arrived.