View Single Post
  #10  
Old Posted Jun 15, 2022, 4:06 PM
The ATX's Avatar
The ATX The ATX is offline
Moderator
 
Join Date: May 2006
Location: Right here, right now
Posts: 12,730
Quote:
Originally Posted by AusTex View Post
Does this mean the sticky can be changed from Site Prep to Under Construction?
To be U/C we need concrete poured for piers/columns/diaphragm wall. I have a new updated list of tallest projects to post in the sticky thread, and this one gets a green highlight. Now I would like to confirm the status of River St. Residences before I post/tweet it.
__________________
Follow The ATX on X:
https://x.com/TheATX1

Things will be great when you're downtown.
Reply With Quote