Posted May 12, 2022, 1:56 PM
|
|
Registered User
|
|
Join Date: Jun 2016
Location: London
Posts: 9,196
|
|
They got some of the 6th floor slabs on the east side of phase 2 of the retirement building installed prior to the construction trades union strike. They have installed some of the windows already on the lower floors
|