From what I can see the May 12th permit is the first where parking is included, is that right? I'm disappointed but in general as long as its underground, not the worst thing that could happen. But I'm concerned where the entrance for the parking will be; The loading dock, which was 2 bays wide, is at the back of the property on the Sansom St. side and even if they were able to add another entrance on Sansom, that would make for a very long curb cut and could change the character of such a small street.

The design shows the main tower being highlighted in three story cubes, so if they have added addition units and floors, I hope its done in the same format.

Has any one else noticed that there has been nothing on the tower proposal for 19th and Chestnut that was first announced last Dec? I Guess it can be added to the 'what happened to these plans' file.