Quote:
Originally Posted by cllew
I wonder if they lost the "air rights" to swing over the PCL project as of the end of April? Makes sense that PCL would want to have their site open for their crane(s).
I am also thinking the luffing jib won't weather vane into the PCL site like the tower crane it just replaced did when the winds get up. As I understand it all tower cranes go into weather vane mode when not in use as not to damage the brake system that locks the unit in place when lifts are being done.
|
This makes the most sense. I also hope it means that Sutton is up and running again.