View Single Post
  #5891  
Old Posted Apr 11, 2021, 9:56 PM
H2O H2O is offline
Registered User
 
Join Date: Jul 2006
Posts: 1,641
Pretty much all the land along SH-130 has been in play for a decade or more since the tollroad was first being built. It takes a long time to entitle, service, and build though. The environmental constraints don't help. Much of the area is in floodplain and the soils are terrible heavy clay.
Reply With Quote