View Single Post
  #36  
Old Posted Apr 6, 2021, 2:06 AM
Pedestrian's Avatar
Pedestrian Pedestrian is offline
Elite Member
 
Join Date: Dec 2016
Location: San Francisco
Posts: 24,128
Quote:
Originally Posted by unpermitted_variance View Post
Those are pretty old renderings; all the up-to-date renders show that site remaining a parking lot. According to the SocketSite article, the area will remain a parking lot until 2023 when the phase 1 buildout is finished, then I assume the lot will be replaced with two buildings with refined design (but likely similar height/massing to what's pictured here.)
"Phase II" means it will come after and remain a parking lot until the completion of "Phase I". Who knows if there will be any design changes before construction begins. The point here is that, yes, there are plans for the lot--it's ultimately part of Mission Rock.

Last edited by Pedestrian; Apr 6, 2021 at 2:24 AM.
Reply With Quote