Aqualuna at Bayside - 62m - 18s - Tridel - 3XN - u/c (excavation)
Great pov from Tridel’s live cam of the AquaLuna site excavation, with bonus glimpses of the Portlands new river valley underway and the first sweet bridge delivered last fall from Amsterdam to Dartmouth to T.O. (top left).
David Capizzano
Best design so far for the East Bayfront imo, and my personal fav new design in the entire downtown.
UT
UT
Portland Commons - 71.5m - 15s - Carttera- Sweeny &Co - u/c
New rendering with revised design for the south elevation.
portla
Red Mars
Early rendering of the entire site.
UT
Ontario Court of Justice Toronto - 96m - 17s - Infrastructure Ontario - Renzo Piano - u/c
Neat cell phone snap by kotsy.
kotsy
UT
Winston watching construction progress.
bilked
UT
357 King West - 148m - 42s - Great Gulf - BDP Quadrangle - u/c
urb@ndweller
UT
The Taylor - 121m - 36s - Tricon - Diamond Schmitt - u/c
Red Mars
UT
Red Mars
Nobu Residences Toronto - 157m - 45s x 2 - Madison Group - Teeple Architects - u/c
urb@ndweller
UT
200 Queens Quay West - 237.5m, 144m - 71s, 41s - Lifetime - Wallman Architects - pre-construction
Virtual Community Consultation next week. The mixed-use development, which includes condos and affordable housing, would replace a huge multi-level parking garage presently blighting the waterfront.
The bronze-toned towers on the right.
UT
212 King Street West - 310m - 79s - Dream Office - SHoP - proposed
A few more pics from the submitted application. Office, rental, residential and retail.
PMT
PMT
UT
1319 Bloor West - 115.5m, 109.5m - 33s, 31s - KingSett Capital - Hariri Pontarini - pre-construction
UT
Link
Casa—Emery Village 55s - Medallion - P + S / IBI - u/c + revised re-zoning application
Originally proposed as 9 rental buildings (from 8s to 30s) and a public park, a new
re-zoning application application has been filed for
5 rental buildings from 20s to 55s.
Construction of early phase underway.
yoshirocks702
Early rendering of what may be the 2 towers already u/c in the above photo (30s and 28s?).
UT
Savile on the Roe - 13.25m | 3s | Block | RAW Design - pre-construction
Pretty sure the project name references its location on Roehampton Avenue, rather than caviar. Perhaps also some wordplay tailoring ala “Saville Row” suits ;-)
AlbertC
AlbertC
191 Sherbourne - 49.5m - 15s - Zeidler Partnership Architects - pre-construction
ferusian
Designs (with mixed reviews) from Turner Fleischer. Perhaps I should have scattered them among other posts ;-).
241 Church - 168.5-m - 53s | Graywood - Turner Fleischer - pre-construction
The one on the left.
UT
UT
985 Woodbine - 14s - Choice Properties - Turner Fleischer - pre-construction
Portions of the existing building facade are now incorporated.
Nuts2020
Nuts2020
840 Dupont (Sobeys Redevelopment) - 40m - 9s | Tridel - Turner Fleischer - pre-construction
Revised design for the large horizontal footprint of the project. Would benefit from more massing articulation (and material mix).
ADRM
ADRM
ADRM
ADRM
Panda Condominiums - 107.6m - 30s - Lifetime - Turner Fleischer - u/c
UT
AlbertC
UT
Suburban Markham
10 Royal Orchard - 59s, 40s, 31s, 25s - Greencapital - Graziani + Corazza - pre-construction
1560 residential units and a public park.
kali
kali
The Bentway (“Under the Gardiner”)
An RFP has been issued by Waterfront Toronto for
Construction Services for the Bentway Phase 1B Project. Not sure what section Phase 1B references.
Overview of the eastern portion of the project from Public Work
UT
Overview of the western portion of the project from Public Work
Some completed sections.
aschender
UT
MetroMan
York Street Park - Waterfront Toronto and City of Toronto
RFP was just issued by Waterfront Toronto for the construction of York Street Park.
Draft Design by Claude Cormier.
WaterfrontToronto Source
ADRM
Shot from 2019 of the site after the York off-ramp was removed.

Toron
https://urbantoronto.ca/forum/attach...f-jpeg.169827/