Thread: VIA Rail
View Single Post
  #1577  
Old Posted Aug 17, 2020, 5:55 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Truenorth00 View Post
They also have a ton of options. Enough for 16 more trainsets. More than likely, the approval of HFR, will see a reconfiguration of something like this:
  • All HFR Toronto-Ottawa-Montreal trains are Extra-Long.
  • All Kingston Hub trains are Extra-Short.
  • All Corridor West trains are Long.
  • All HFR Montreal-Quebec City trains are Short.

And they'll purchase extra cars and locomotives to accommodate those configs at their target schedules, through the options they have.
That seems reasonable, though it might not be so cut and dry. Most routes see seasonal changes in demand, so may change length at different times of the year.

I am also not so sure that all trains along a given route will be the same length. Trains may be scheduled to run routes that match demand to their capacity. A morning peak train from London to Toronto, might become a mid day train from Toronto to Ottawa/Montreal and then become a pm peak train to Quebec City. Similarly, the first train out of Kingston might be "Short" (to meet the demand from commuters) and then turn into a midday train to London/Windsor. Having trains change routes like this has the added benefit of allowing people to continue on the same train without having to transfer.

The basic idea makes sense though.
Reply With Quote