View Single Post
  #353  
Old Posted Apr 20, 2020, 7:44 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,799
It should be; funding for detailed design was announced in 2016 and it is shown as Completed on the Infrastructure Canada website: https://www.infrastructure.gc.ca/pt-sp/pt-sp-on-eng.html
Reply With Quote