View Single Post
  #11567  
Old Posted Aug 16, 2019, 6:36 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,818
Quote:
Originally Posted by lrt's friend View Post
With trains departing from two different platforms at Tunney's Pasture, will there be a departure countdown on display screens? No sense running down to one platform, just to have go back up and go over to the other platform. That will be a pain. I know I experienced that with the Trillium Line at Greenboro that could have been avoided if I had known the train was departing in 10 seconds instead of 1 minute.
I don't know if they have that, but I'm puzzled as to why they didn't built centre platforms at all terminus stations. Tunney's, Bayview (Trillum at least), Moodie. Prepare for years of confusion at those stations.

At least they got it right for Blair, Trim, Baseline, South Keys and Limebank.

Quote:
Originally Posted by Badyouken View Post
I think they usually said it would take "up to 4 weeks", perhaps to be on the safe side.

That's the usual message. I don't know if they're more confident now or if they want to rush for a September opening.