Quote:
Originally Posted by Wpg_Guy View Post
Phase 1: 18,600 SF of office/retail space in the James Ave Pumping Station Building. 100% leased. Spring 2018 occupancy.

Phase 2: 30 high end rental apartments on Waterfront Drive available Winter 2020.

Phase 3: 70 rental apartments. Summer 2020 occupancy.




@j_thorsteinson{ Newish renders of the James Ave. pumping station reno/addn by @546arch which just got a @CdnArch Award of Excellence.
https://twitter.com/j_thorsteinson/s...37762476728321















Phase 2:



Interior of pump house:








Source: Tim Hughes (@tim_hughes1) on Instagram

some images of phase one.

Quote:
Pumped up
After many failed redevelopment attempts, 'breathtaking' James Avenue Pumping Station welcomes first tenants
By: Bill Redekop | Posted: 04/16/2019 7:00 PM

Alston Properties came up with a plan that included purchasing lots on either side of the pumping station to locate a four-storey and a six-storey rental apartment. The apartments will be elevated off the ground so as not to block the pump house facade or view from inside.

That provided some of the economics. Then it had to find a single tenant in need of 10,000 square feet of office space. The office space is built in the rafters, held up by the building’s steel girders.

It would be too expensive to try to subdivide the space into multiple compartments. But the site was ideal for Think.Shift and its 55 employees.

The first phase of redeveloping the pump house cost $3 million. The entire project once apartment blocks are completed will come to $22 million, Alston said.

Both the building and the equipment inside are protected as a designated heritage site. Amid the giant steel wheels, there are also cranes running along horizontal beams with hooks and chains dangling down. They were used to move the giant wheels into place and left behind in case equipment ever needed servicing. The geared wheels weigh up to eight tonnes.
https://www.winnipegfreepress.com/bu...508666742.html













08/16/2019

@justDarylD Stud walls going up at James Ave Pumphouse.
https://twitter.com/justDarylD/statu...070744073?s=20

8/28/2019

https://twitter.com/centreventure/st...780319233?s=20

Aug 30, 2019
Quote:
Originally Posted by Wpg_Guy View Post
09/17/2019
Quote:
Originally Posted by buzzg View Post
September 17:

[/QUOTE]

Sep 19, 2019
Quote:
Originally Posted by Wpg_Guy View Post
Sep 20, 2019
Quote:
Originally Posted by OTA in Winnipeg View Post
Definitely.

https://www.flickr.com/photos/661751...82242/sizes/h/


https://www.flickr.com/photos/661751...62458/sizes/l/
by Chadillaccc

Quote:
Originally Posted by OTA in Winnipeg View Post
Quote:
Oct 20 2019












Quote:
Originally Posted by headhorse View Post
windows going in



from https://twitter.com/HolzPrefab
10/27/2019
Quote:
Originally Posted by Wpg_Guy View Post






11/03/2019:








Quote:
01/04/2020












Quote:
September 2020






Quote:
Nov 2020 phase 3:
__________________
Winnipeg Act II - April 2024

In The Future Every Building Will Be World-Famous For Fifteen Minutes.

Instagram

Last edited by Wpg_Guy; Nov 9, 2020 at 5:57 AM.
Reply With Quote