Quote:
Originally Posted by Design-mind
I thought maybe they had already poured some footings or even slab. But it looks to me as they are still working on pilings.
|
Users on UrbanToronto have said that they need to install 32 super columns which I feel like is supposed to take about 6 months total. Last I saw they had done 24 of the 32.