Quote:
Originally Posted by emathias
Does anyone know if they'll be digging out platforms long enough for at least ten-car trains? I would hope so since, if the north Red Line ridership grows the way the CTA thinks it might, they'll probably want to run ten-car trains shortly after finishing the RPM project(s).
|
On the detail diagram, it says the platforms will be 520 ft long. Given than a CTA car is 48 ft long, a 10-car train will be 480 ft long so well within range for the platform.