View Single Post
  #462  
Old Posted Oct 21, 2018, 7:49 PM
BonoboZill4's Avatar
BonoboZill4 BonoboZill4 is offline
Registered User
 
Join Date: Aug 2018
Location: PingPong
Posts: 1,588
Quote:
Originally Posted by IronWright View Post
It's frustrating that developers in Chicago always choose to build multi-tower projects in phases from smallest to tallest with long intervals in between. I'm hoping One Chicago Square and 400 N. LSD build simultaneously. I doubt that is their intentions however. The 78 will likely end up being a 20+ year process like Lakeshore East.
The 78 is definitely going to be a long process even if Amazon comes it'll take more than a decade to be built, but with those two proposals you mentioned, I know they already said that OCS is being built all at once(should start early next year) and 400N LSD is going to be a two phase process with the smaller one being built first over the old foundation(as of now that is the plan at least).
__________________
I'm here for a long time, not a good time
Reply With Quote